Tuesday, May 27, 2008

Week 10 - 3rd Stage Model Image Captures

Images: Uploads from UT2004 of Third Stage Model

Overview of model showing the modifications to the bridge. The levels still need to be joinde up bu suspension.

Zhang Yin's factory/office pyramid built within the bridge. Yet to have suspension arch added over the top.

Re-lit elevator loby. Will most likey be replaced by a better meeting place.

Steve Jobs's office. Multiple pathways show the centre of command found in Jobs's work ethics. Pathways lead to departmental offices and elevator.

No comments: