Images: Uploads from UT2004 of Third Stage Model
Overview of model showing the modifications to the bridge. The levels still need to be joinde up bu suspension.
Zhang Yin's factory/office pyramid built within the bridge. Yet to have suspension arch added over the top.
Re-lit elevator loby. Will most likey be replaced by a better meeting place.
Steve Jobs's office. Multiple pathways show the centre of command found in Jobs's work ethics. Pathways lead to departmental offices and elevator.
No comments:
Post a Comment